Achieve a flawless, bubble-free finish every time with our high-performance Application Gel, formulated specifically for the seamless installation of your screen protectors and Clear Series skins. Unlike conventional, runny liquid sprays that drip uncontrollably and risk leaking into your device’s sensitive ports and speaker grilles, our advanced high-viscosity gel stays precisely where you dispense it. This controlled consistency provides the perfect lubricated glide, giving you the time and precision to effortlessly slide, reposition, and align your skin to perfection before locking it down. Squeegeeing away cleanly to leave a 100% invisible, optical-grade finish, it turns high-stress installations into a clean, mess-free experience with zero liquid runoff and zero hassle.
Instructions:
-
Clean the Device
Power off your device. Wash your hands to prevent skin oils from transferring to the adhesive. Clean the screen thoroughly with an alcohol wipe and microfiber cloth, making sure there are no dust particles left on the area.
-
Prep Your Fingers & Peel
Dispense a small dab of Application Gel onto your fingertips to avoid leaving fingerprints. Carefully peel the protective backing film away from the adhesive side of the protector.
-
Apply the Gel
Spray or apply 2 to 5 pumps of the gel across the adhesive side of the screen protector. The high-viscosity formula will cling to the surface without running off the edges.
-
Align and Adjust
Place the protector onto your device’s screen. The gel barrier allows you to slide, adjust, and reposition the protector smoothly until the speaker, camera cutouts, and borders are perfectly aligned. If misaligned, remove, re-apply gel and re-align.
-
Squeegee Out Excess Gel
Hold the protector steady in the center with one finger. Using a squeegee card wrapped in a microfiber cloth, push outward firmly from the center toward the outer edges to squeegee out excess gel and air pockets. Wipe away the expelled gel along the borders with a dry cloth.
-
Allow to Set
Let the device rest for 45 to 60 minutes before handling. Any tiny micro-bubbles or subtle moisture haze underneath will naturally evaporate within 24 to 48 hours, leaving an optical-grade finish.

